EASTEED / PRIVATE WEBSITE PREVIEWAbout the imagery
Collection / The material gallery

Material, on display.

Explore original sole photographs on glass displays. Enlarge a reference, then use the model number to begin a development brief.

68 original photographs · 68 catalogue references

Original photography / Tap a display to enlarge
P001 / DJ-S7005Enlarge original ↗
Supercritical / Premium line

DJ-S7005

A premium material direction.

Use this shape as a starting reference for a supercritical sole brief. Polymer grade, foam structure and measurable targets are defined with the actual project.

P002 / DJ-S7003Enlarge original ↗
Supercritical / Premium line

DJ-S7003

Geometry for the wearer.

Discuss the rocker, sidewall and ground-contact layout in relation to the intended upper, last and use case.

P003 / SCF-25018Enlarge original ↗
Supercritical / Premium line

SCF-25018

Colour and construction.

Review colour placement, surface finish and outsole pairing against a physical sample before approving the build.

P005 / GRN-23019Enlarge original ↗
Supercritical / Premium line

GRN-23019

Test the complete system.

Agree the sample size, test method and acceptance criteria before making a performance claim about this construction.

P006 / DJ-S7001Enlarge original ↗
Supercritical / Premium line

DJ-S7001

A premium material direction.

Use this shape as a starting reference for a supercritical sole brief. Polymer grade, foam structure and measurable targets are defined with the actual project.

P007 / DJ-S7002Enlarge original ↗
Supercritical / Premium line

DJ-S7002

Geometry for the wearer.

Discuss the rocker, sidewall and ground-contact layout in relation to the intended upper, last and use case.

P010 / Supercritical slide 01Enlarge original ↗
Supercritical / Premium line

Supercritical slide 01

Colour and construction.

Review colour placement, surface finish and outsole pairing against a physical sample before approving the build.

P011 / Supercritical slide 02Enlarge original ↗
Supercritical / Premium line

Supercritical slide 02

Test the complete system.

Agree the sample size, test method and acceptance criteria before making a performance claim about this construction.

P012 / 8988Enlarge original ↗
Rubber outsoles

8988

Map the ground contact.

Use the tread pattern to discuss intended surfaces, flex direction and the areas where grip matters most.

P013 / 9001Enlarge original ↗
Rubber outsoles

9001

Rubber and geometry together.

A drawing alone does not establish traction or wear. Select a compound and evaluate it with the actual outsole construction.

P014 / 9002Enlarge original ↗
Rubber outsoles

9002

From court to outdoor.

The same visual reference can lead to different rubber, lug and bonding decisions when the intended application changes.

P015 / 9003Enlarge original ↗
Rubber outsoles

9003

Specify before release.

Confirm hardness, abrasion, adhesion and appearance criteria for the approved sample and target market.

P016 / 9005Enlarge original ↗
Rubber outsoles

9005

Map the ground contact.

Use the tread pattern to discuss intended surfaces, flex direction and the areas where grip matters most.

P017 / 9006Enlarge original ↗
Rubber outsoles

9006

Rubber and geometry together.

A drawing alone does not establish traction or wear. Select a compound and evaluate it with the actual outsole construction.

P018 / 9008Enlarge original ↗
Rubber outsoles

9008

From court to outdoor.

The same visual reference can lead to different rubber, lug and bonding decisions when the intended application changes.

P019 / 9009Enlarge original ↗
Rubber outsoles

9009

Specify before release.

Confirm hardness, abrasion, adhesion and appearance criteria for the approved sample and target market.

P020 / 9010Enlarge original ↗
Rubber outsoles

9010

Map the ground contact.

Use the tread pattern to discuss intended surfaces, flex direction and the areas where grip matters most.

P021 / 9011Enlarge original ↗
Rubber outsoles

9011

Rubber and geometry together.

A drawing alone does not establish traction or wear. Select a compound and evaluate it with the actual outsole construction.

P022 / 9012Enlarge original ↗
Rubber outsoles

9012

From court to outdoor.

The same visual reference can lead to different rubber, lug and bonding decisions when the intended application changes.

P023 / 9013Enlarge original ↗
Rubber outsoles

9013

Specify before release.

Confirm hardness, abrasion, adhesion and appearance criteria for the approved sample and target market.

P024 / 9015Enlarge original ↗
Rubber outsoles

9015

Map the ground contact.

Use the tread pattern to discuss intended surfaces, flex direction and the areas where grip matters most.

P025 / 9016Enlarge original ↗
Rubber outsoles

9016

Rubber and geometry together.

A drawing alone does not establish traction or wear. Select a compound and evaluate it with the actual outsole construction.

P026 / 9519Enlarge original ↗
Rubber outsoles

9519

From court to outdoor.

The same visual reference can lead to different rubber, lug and bonding decisions when the intended application changes.

P027 / 9520Enlarge original ↗
Rubber outsoles

9520

Specify before release.

Confirm hardness, abrasion, adhesion and appearance criteria for the approved sample and target market.

P028 / 9521Enlarge original ↗
Rubber outsoles

9521

Map the ground contact.

Use the tread pattern to discuss intended surfaces, flex direction and the areas where grip matters most.

P029 / 9522Enlarge original ↗
Rubber outsoles

9522

Rubber and geometry together.

A drawing alone does not establish traction or wear. Select a compound and evaluate it with the actual outsole construction.

P030 / 9523Enlarge original ↗
Rubber outsoles

9523

From court to outdoor.

The same visual reference can lead to different rubber, lug and bonding decisions when the intended application changes.

P031 / 9525Enlarge original ↗
Rubber outsoles

9525

Specify before release.

Confirm hardness, abrasion, adhesion and appearance criteria for the approved sample and target market.

P032 / 7001Enlarge original ↗
MD moulding

7001

Shape the midsole brief.

Start with the profile, weight target, support areas and upper interface before selecting an MD route.

P033 / 7002Enlarge original ↗
MD moulding

7002

Fit and flex in context.

Heel bevels and forefoot grooves should be evaluated on the complete shoe, not inferred from a catalogue photograph.

P034 / 7003Enlarge original ↗
MD moulding

7003

A considered build.

Surface colour, branding and reinforcement can be reviewed as part of a customer-specific drawing and sample plan.

P035 / 7005Enlarge original ↗
MD moulding

7005

Prepare for repeatability.

Record the approved reference, material specification and dimensional tolerances before production release.

P036 / 7006Enlarge original ↗
MD moulding

7006

Shape the midsole brief.

Start with the profile, weight target, support areas and upper interface before selecting an MD route.

P037 / 7007Enlarge original ↗
MD moulding

7007

Fit and flex in context.

Heel bevels and forefoot grooves should be evaluated on the complete shoe, not inferred from a catalogue photograph.

P038 / 7008Enlarge original ↗
MD moulding

7008

A considered build.

Surface colour, branding and reinforcement can be reviewed as part of a customer-specific drawing and sample plan.

P039 / 7009Enlarge original ↗
MD moulding

7009

Prepare for repeatability.

Record the approved reference, material specification and dimensional tolerances before production release.

P040 / 7010Enlarge original ↗
MD moulding

7010

Shape the midsole brief.

Start with the profile, weight target, support areas and upper interface before selecting an MD route.

P041 / 7011Enlarge original ↗
MD moulding

7011

Fit and flex in context.

Heel bevels and forefoot grooves should be evaluated on the complete shoe, not inferred from a catalogue photograph.

P042 / 7012Enlarge original ↗
MD moulding

7012

A considered build.

Surface colour, branding and reinforcement can be reviewed as part of a customer-specific drawing and sample plan.

P043 / 7013Enlarge original ↗
MD moulding

7013

Prepare for repeatability.

Record the approved reference, material specification and dimensional tolerances before production release.

P044 / 7015Enlarge original ↗
MD moulding

7015

Shape the midsole brief.

Start with the profile, weight target, support areas and upper interface before selecting an MD route.

P045 / 7016Enlarge original ↗
MD moulding

7016

Fit and flex in context.

Heel bevels and forefoot grooves should be evaluated on the complete shoe, not inferred from a catalogue photograph.

P046 / 7017Enlarge original ↗
MD moulding

7017

A considered build.

Surface colour, branding and reinforcement can be reviewed as part of a customer-specific drawing and sample plan.

P047 / 7018Enlarge original ↗
MD moulding

7018

Prepare for repeatability.

Record the approved reference, material specification and dimensional tolerances before production release.

P048 / 7021Enlarge original ↗
MD moulding

7021

Shape the midsole brief.

Start with the profile, weight target, support areas and upper interface before selecting an MD route.

P049 / 7259Enlarge original ↗
MD moulding

7259

Fit and flex in context.

Heel bevels and forefoot grooves should be evaluated on the complete shoe, not inferred from a catalogue photograph.

P050 / 7260Enlarge original ↗
MD moulding

7260

A considered build.

Surface colour, branding and reinforcement can be reviewed as part of a customer-specific drawing and sample plan.

P051 / 7261Enlarge original ↗
MD moulding

7261

Prepare for repeatability.

Record the approved reference, material specification and dimensional tolerances before production release.

P052 / 5001Enlarge original ↗
EVA injection

5001

An integrated EVA direction.

Review whether an injection route suits the intended component, size range and construction before tooling begins.

P053 / 5002Enlarge original ↗
EVA injection

5002

Comfort needs a test.

Feel and fit should be reviewed on the actual sample with the intended upper or footbed configuration.

P054 / 5003Enlarge original ↗
EVA injection

5003

Refine the footbed.

Discuss contour, flex and toe shape using a drawing and physical reference, then confirm the approved geometry.

P055 / 5005Enlarge original ↗
EVA injection

5005

Control colour and size.

Colour targets, shrinkage allowances and size grading belong in the project specification and sample approval.

P056 / 5006Enlarge original ↗
EVA injection

5006

An integrated EVA direction.

Review whether an injection route suits the intended component, size range and construction before tooling begins.

P057 / 5007Enlarge original ↗
EVA injection

5007

Comfort needs a test.

Feel and fit should be reviewed on the actual sample with the intended upper or footbed configuration.

P058 / 5008Enlarge original ↗
EVA injection

5008

Refine the footbed.

Discuss contour, flex and toe shape using a drawing and physical reference, then confirm the approved geometry.

P059 / 5009Enlarge original ↗
EVA injection

5009

Control colour and size.

Colour targets, shrinkage allowances and size grading belong in the project specification and sample approval.

P060 / 5009(EVA)Enlarge original ↗
EVA injection

5009(EVA)

An integrated EVA direction.

Review whether an injection route suits the intended component, size range and construction before tooling begins.

P061 / 5010Enlarge original ↗
EVA injection

5010

Comfort needs a test.

Feel and fit should be reviewed on the actual sample with the intended upper or footbed configuration.

P062 / 5101Enlarge original ↗
EVA injection

5101

Refine the footbed.

Discuss contour, flex and toe shape using a drawing and physical reference, then confirm the approved geometry.

P063 / 5102Enlarge original ↗
EVA injection

5102

Control colour and size.

Colour targets, shrinkage allowances and size grading belong in the project specification and sample approval.

P064 / 5103Enlarge original ↗
EVA injection

5103

An integrated EVA direction.

Review whether an injection route suits the intended component, size range and construction before tooling begins.

P065 / 5105Enlarge original ↗
EVA injection

5105

Comfort needs a test.

Feel and fit should be reviewed on the actual sample with the intended upper or footbed configuration.

P066 / 5107Enlarge original ↗
EVA injection

5107

Refine the footbed.

Discuss contour, flex and toe shape using a drawing and physical reference, then confirm the approved geometry.

P067 / 5108Enlarge original ↗
EVA injection

5108

Control colour and size.

Colour targets, shrinkage allowances and size grading belong in the project specification and sample approval.

P068 / 5110Enlarge original ↗
EVA injection

5110

An integrated EVA direction.

Review whether an injection route suits the intended component, size range and construction before tooling begins.

P069 / 5111Enlarge original ↗
EVA injection

5111

Comfort needs a test.

Feel and fit should be reviewed on the actual sample with the intended upper or footbed configuration.

P070 / 5112Enlarge original ↗
EVA injection

5112

Refine the footbed.

Discuss contour, flex and toe shape using a drawing and physical reference, then confirm the approved geometry.

P071 / 5113Enlarge original ↗
EVA injection

5113

Control colour and size.

Colour targets, shrinkage allowances and size grading belong in the project specification and sample approval.

The complete Dongjun catalogue

Find the reference.
Start the conversation.

Public source models are listed here. Select a name to inspect its unretouched catalogue photograph.

68 Dongjun catalogue sole references
Model / Original imageryDirectionTooling contextReferenceProject brief
P001SupercriticalProject review requiredDetails ↗Enquire ↗
P002SupercriticalProject review requiredDetails ↗Enquire ↗
P003SupercriticalProject review requiredDetails ↗Enquire ↗
P005SupercriticalProject review requiredDetails ↗Enquire ↗
P006SupercriticalProject review requiredDetails ↗Enquire ↗
P007SupercriticalProject review requiredDetails ↗Enquire ↗
P010SupercriticalProject review requiredDetails ↗Enquire ↗
P011SupercriticalProject review requiredDetails ↗Enquire ↗
P012Rubber outsolesProject review requiredDetails ↗Enquire ↗
P013Rubber outsolesProject review requiredDetails ↗Enquire ↗
P014Rubber outsolesProject review requiredDetails ↗Enquire ↗
P015Rubber outsolesProject review requiredDetails ↗Enquire ↗
P016Rubber outsolesProject review requiredDetails ↗Enquire ↗
P017Rubber outsolesProject review requiredDetails ↗Enquire ↗
P018Rubber outsolesProject review requiredDetails ↗Enquire ↗
P019Rubber outsolesProject review requiredDetails ↗Enquire ↗
P020Rubber outsolesProject review requiredDetails ↗Enquire ↗
P021Rubber outsolesProject review requiredDetails ↗Enquire ↗
P022Rubber outsolesProject review requiredDetails ↗Enquire ↗
P023Rubber outsolesProject review requiredDetails ↗Enquire ↗
P024Rubber outsolesProject review requiredDetails ↗Enquire ↗
P025Rubber outsolesProject review requiredDetails ↗Enquire ↗
P026Rubber outsolesProject review requiredDetails ↗Enquire ↗
P027Rubber outsolesProject review requiredDetails ↗Enquire ↗
P028Rubber outsolesProject review requiredDetails ↗Enquire ↗
P029Rubber outsolesProject review requiredDetails ↗Enquire ↗
P030Rubber outsolesProject review requiredDetails ↗Enquire ↗
P031Rubber outsolesProject review requiredDetails ↗Enquire ↗
P032MD mouldingProject review requiredDetails ↗Enquire ↗
P033MD mouldingProject review requiredDetails ↗Enquire ↗
P034MD mouldingProject review requiredDetails ↗Enquire ↗
P035MD mouldingProject review requiredDetails ↗Enquire ↗
P036MD mouldingProject review requiredDetails ↗Enquire ↗
P037MD mouldingProject review requiredDetails ↗Enquire ↗
P038MD mouldingProject review requiredDetails ↗Enquire ↗
P039MD mouldingProject review requiredDetails ↗Enquire ↗
P040MD mouldingProject review requiredDetails ↗Enquire ↗
P041MD mouldingProject review requiredDetails ↗Enquire ↗
P042MD mouldingProject review requiredDetails ↗Enquire ↗
P043MD mouldingProject review requiredDetails ↗Enquire ↗
P044MD mouldingProject review requiredDetails ↗Enquire ↗
P045MD mouldingProject review requiredDetails ↗Enquire ↗
P046MD mouldingProject review requiredDetails ↗Enquire ↗
P047MD mouldingProject review requiredDetails ↗Enquire ↗
P048MD mouldingProject review requiredDetails ↗Enquire ↗
P049MD mouldingProject review requiredDetails ↗Enquire ↗
P050MD mouldingProject review requiredDetails ↗Enquire ↗
P051MD mouldingProject review requiredDetails ↗Enquire ↗
P052EVA injectionProject review requiredDetails ↗Enquire ↗
P053EVA injectionProject review requiredDetails ↗Enquire ↗
P054EVA injectionProject review requiredDetails ↗Enquire ↗
P055EVA injectionProject review requiredDetails ↗Enquire ↗
P056EVA injectionProject review requiredDetails ↗Enquire ↗
P057EVA injectionProject review requiredDetails ↗Enquire ↗
P058EVA injectionProject review requiredDetails ↗Enquire ↗
P059EVA injectionProject review requiredDetails ↗Enquire ↗
P060EVA injectionProject review requiredDetails ↗Enquire ↗
P061EVA injectionProject review requiredDetails ↗Enquire ↗
P062EVA injectionProject review requiredDetails ↗Enquire ↗
P063EVA injectionProject review requiredDetails ↗Enquire ↗
P064EVA injectionProject review requiredDetails ↗Enquire ↗
P065EVA injectionProject review requiredDetails ↗Enquire ↗
P066EVA injectionProject review requiredDetails ↗Enquire ↗
P067EVA injectionProject review requiredDetails ↗Enquire ↗
P068EVA injectionProject review requiredDetails ↗Enquire ↗
P069EVA injectionProject review requiredDetails ↗Enquire ↗
P070EVA injectionProject review requiredDetails ↗Enquire ↗
P071EVA injectionProject review requiredDetails ↗Enquire ↗

Every display shows its full original Dongjun catalogue photograph. The glass stands and lighting are website presentation only.

Public reference photographs are copied without cropping or retouching from the supplied Dongjun website archive. The three references marked as customer-specific tooling remain private. A photograph does not confirm current stock, mould access, material grade or test performance.

A reference is a beginning.
Let’s define what comes next.

Bring an application, a reference or an open question. Let’s turn it into a useful development brief.

Start a project
Find the right starting point

Compare applications.

Application concepts, not verified production specifications. Material, construction, tooling and commercial conditions are confirmed for the actual project.

A closer look

Sole reference

100%

Discuss this direction ↗View details ↗